Development finance is a short-term loan that pays for buying a site and building or converting on it, released in stages as the work progresses and repaid when the finished units are sold or refinanced. It is not a mortgage on a home you live in. If you work in the trades and are thinking about your first scheme, this guide covers how the money moves, what lenders look at and where first-timers get caught out.
A standard residential mortgage is based on your income and the current value of a property. Development finance works the other way round. The lender assesses the project: what the site costs, what the build will cost and what the finished property should be worth. That finished value is called the gross development value, or GDV.
It can fund ground-up schemes, such as buying a plot and building houses or flats, and heavier conversions, such as turning offices into homes. Lenders describe it as secured, short-term lending for residential, mixed-use and commercial projects, covering mortgages, term loans, bridging and mezzanine finance under the wider heading of property development finance.
For a lighter project, such as buying a house, refurbishing it and selling it, a bridging loan is often the tool instead. We cover the difference in our guide to heavy refurbishment bridging.
Lenders structure these loans in slightly different ways, but the sequence is broadly the same.
The Development Bank of Wales also notes that development loans are released in stages based on project milestones. That is why a realistic build programme matters. A delay does not just cost time, it can hold up the next release of funds.
If you plan to build a home for yourself, the process is different: see how self build mortgage stages release money.
Don’t expect 100% funding. The Construction Leadership Council’s guide for small housebuilders says lenders will, with few exceptions, not lend the entire development cost. They lend a percentage of cost or of GDV, and expect a fully funded project from day one.
Two ratios come up constantly:
A worked example: a scheme with total costs of £800,000 and a lender offering 60% of cost would lend £480,000. You would need to find the remaining £320,000 as cash, land equity or other funding. The figures here are illustrative only and are not a lender offer.
The same guide explains that the developer’s own money normally goes in first and their return comes out last. Lenders also typically ask for personal guarantees, and the lower your own equity, the more likely a guarantee is to be required. A personal guarantee means you could be personally liable if the project does not repay the loan, so read it carefully and take legal advice before you sign.

Most projects are funded from a capital stack: your equity, then optional mezzanine or junior debt, then senior debt from the main lender. The CLC guide notes that higher leverage generally costs more.

Mezzanine finance sits behind the senior loan. If the project struggles, the senior lender is repaid first, so mezzanine lenders charge more for the extra risk. It can reduce the cash you need to put in, but it adds cost and another party to the deal.
For a sense of scale, the Investment Property Forum’s research on year-end 2014 found mezzanine for fully pre-let commercial development carried margins of 800 to 1,200 basis points. A basis point is one hundredth of a percentage point, so that is 8% to 12% over the lender’s base rate. That is a commercial-sector snapshot from 2014, not a current quote. Pricing moves with the market and with the lender’s view of your scheme.
Yes, first-time developers can borrow, but you need to show you can deliver. According to the CLC guide, where experience is lacking you need clear evidence of transferable skills plus strong planning and sales ability. For people from the trades, hands-on construction experience is a real asset, but lenders will also want to see that you can manage costs, contractors and a sale.
Expect lenders to look at:
If your income is mainly CIS or self-employed earnings, that is still relevant, particularly for personal guarantees and for any lending against your own home. Lender criteria differ, so it is worth having your tax returns and figures ready.
Beyond interest, budget for arrangement fees, exit fees, valuation and monitoring surveyor costs, and legal fees. The IPF’s 2011 outlook report recorded typical pricing at that time of upfront fees of 1% to 3% and margins of 2.75% to 4.5%. That was a 2011 view of bank lending, so treat it as context for the kinds of charge involved, not as today’s pricing.
The same report describes London lending as more concentrated, with some lenders focused solely on the capital. If you are looking at a scheme in London or the South East, the lenders who suit you may differ from those who suit a smaller regional site.
A development loan is short-term, so the repayment plan is part of the application. If you intend to sell, your lender will want to see realistic values and timescales. If you intend to keep the properties as rentals, you will need longer-term finance when the build ends. Our guide to development exit finance covers the options at practical completion. If you are starting with a plot, bridging against land is another route some people use before the main facility is in place.
Most first-time developers we speak to are skilled builders who have never had to present a project to a lender. The build is rarely the weak point. The paperwork around it is: costs, sales evidence, the exit and how the funding fits together.
We would rather you understood the structure before you commit to a site. Know how much cash you need, what a personal guarantee means for you and your home, and how you will repay the loan if sales take longer than planned.
Every project and every borrower is different, and lender criteria vary, so we look at your circumstances first and explain the costs and risks plainly before you decide anything.
Paul McMath CeMAP CeRER
We are a mortgage and protection advice firm based in St. Leonards-on-Sea, and we help clients in Hastings, Bexhill-on-Sea, Eastbourne, Hailsham and across East Sussex and the UK. Our services include bridging and commercial finance, and we work with self-employed people, CIS subcontractors and company directors.
If you are weighing up a first project, you can look at our bridging and commercial finance page, or speak to us about how your own income and borrowing would be viewed alongside the scheme. Nothing here is a promise of approval or of any rate.
Yes, though lenders will want evidence you can deliver. That usually means transferable skills, a realistic budget, planning permission and a clear exit. A track record helps, but a strong team can partly make up for a lack of one.
Rarely. Lenders typically lend a percentage of cost or GDV and expect the developer to contribute first. Mezzanine finance can reduce your cash input, but it costs more and adds complexity.
Interest is added to the loan balance during the term instead of being paid monthly, and is settled when you repay. Because it compounds on the balance, it increases the total you owe, so factor it into your budget.
Terms are usually between 6 and 24 months, set to match your build programme and sale period. Some lenders describe it as a short-term facility of 6 to 24 months, so always allow some contingency for delays.
This article provides general information and is not a personal mortgage recommendation. Mortgage availability and eligibility depend on your circumstances and lender criteria. Rates and criteria can change. We will explain any applicable fees before you commit. Think carefully before securing other debts against your home. Consolidating debts over a longer term may reduce your monthly payments but increase the total amount you repay. Your home may be repossessed if you do not keep up repayments